|
A method of crack
repair for building crack meter and paving material
which lowers an existing surface to a new working
surface which is low enough to effect repairs without
changing the elevation crack meter or attitude of the
original surface: which fills the crack with grout which
is in turn sealed by a bridging material. An initial
overlay material is placed over the bridging material
and a reinforcing strip embedded in the overlay material
followed by a second layer of overlay material
sufficient to return the repaired crack meter area to
the elevation and attitude of the original surface.
1. The method of crack repair crack meter for building
and paving material, comprising the steps of:
a. lowering the original surface in the area surrounding
the crack to a depth sufficient to effect repair of the
surface without changing the elevation or attitude of
the original surface, and
b cleaning and filling said crack with a crack filling
material, and crack meter
c. applying a flexible fabric bridging material
containing an adhesive which adheres to said crack
filling material crack meter and said existing building
or paving material and which has a glazed upper surface
with a low coefficient of friction which discourages
bonding with additional repair materials which will be
placed above said bridging material, and
d. application of an initial overlay material
crack
meter over said bridging material, and
e. embedment of a reinforcement material within said
initial overlay material, and
f. application of a second layer of overlay material
over said initial overlay natural in an amount
sufficient to bring the crack meter new surface flush
with said original surrounding surface.
|